N-1Application - Redacted
6 passages
3 The proposed Demand Charge of $14.341 per kilowatt (kW) of billing demand reflects a sum of 4 two components: 5 6 (1) the 2027 FAM-based component of $8.142 per kW, determined in the 2027 Base Cost of 7 Fuel calculations in Partially Con...
AI summary The text outlines the composition of the proposed Demand Charge, which is set at $14.341 per kilowatt (kW) of billing demand. This charge is divided into two distinct components: a FAM-based component of $8.142 per kW, derived from the 2027 Base Cost of Fuel calculations, and a non-FAM-based component of $6.20 per kW as detailed in the provided appendices.
2 7.6 Board Directive regarding Interruptible Service in the RTR Market 3 4 The Board provided the following directive in its Order, dated March 20, 2024, approving the 2024 5 AARs: 6 7 NS Power and Roswall are directed to explore ways in...
AI summary The Nova Scotia Energy Board (NSEB) issued a directive in its March 20, 2024, Order requiring Nova Scotia Power and Renewall Energy Inc. to explore mechanisms for allowing interruptible customers to participate in the Real-Time Pricing (RtR) market. The parties are currently collaborating on tariff, settlement, and operational considerations to enable this service, as part of broader market development initiatives and the 2026 General Rate Application (GRA) proceedings.
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 3 of 5 (3) The customers will reduce their available interruptible system load by the amount required by NSPI within ten (10) minutes of NSPI initiating and sending notice to the custom...
AI summary The text outlines the requirements and penalty structures for a Generation Replacement and Load Following tariff. Customers must be able to reduce interruptible system load within ten minutes of a notice from NSPI, maintaining a dedicated telephone system and staff. The Company may also use automated control to interrupt load held as Operating Reserve. Non-compliance results in two-part penalties: a Threshold Penalty (cost of firm billing) and a Performance Penalty based on residual demand and average demand during the interruption event, capped at twice the firm billing cost.
AVAILABILITY - (1) This tariff is available to port authorities of Nova Scotia for the sole purpose of providing port electricity to cruise ships docked in ports to meet their own consumption needs in displacement of the on-board self-gene...
AI summary The document outlines the availability and conditions of a specific tariff for Nova Scotia port authorities. The tariff is intended solely for providing electricity to docked cruise ships to displace on-board self-generation, provided the regular demand is at least 2,000 kVA or 1,800 kW. Customers under this tariff must accept supply interruptions. In the event of supply shortfalls, the tariff establishes a specific priority sequence for calling upon various rate classes to provide capacity to Nova Scotia Power Inc. (NSPI). The tariff is seasonal, active from April 1 to November 30.
- (2) Demand-related fixed generation cost, coming into effect as a result of a General Rate Application. Demand Charge Components $ per kW of billing demand Demand-related Purchased Power Cost $8.142 Demand-related Fixed Generation Cost $...
AI summary The document outlines the demand-related fixed generation costs resulting from a General Rate Application. It provides a breakdown of demand charge components, specifically identifying the Demand-related Purchased Power Cost ($8.142 per kW) and the Demand-related Fixed Generation Cost ($6.200 per kW), totaling $14.341 per kW of billing demand. It further defines 'Contract Demand' as the firm demand requested by wholesale customers and agreed upon by Nova Scotia Power Inc. (NSPI).
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 3 of 5 customer from its responsibilities under this rider. (3) The customers will reduce their available interruptible system load by the amount required by NSPI within ten (10) minute...
AI summary This section outlines the operational requirements and penalties for customers participating in the Generation Replacement and Load Following Tariff. Customers must be able to reduce interruptible system load within ten minutes of notification and maintain a dedicated telephone system for automated dialing. The Company may use automated controls to interrupt load for Operating Reserve. Failure to comply with load reduction requirements results in a two-part penalty consisting of a Threshold Penalty (cost of firm billing) and a Performance Penalty based on the specific performance during the event.