N-1-(ii)Appendix 2 - ISO Enduring Fee Cost Recovery Recommendation
7 passages
Steps 3 and 4 considerations for Nova Scotia The primary decision for steps 3 and 4 is to determine the process behind fee setting. The Jurisdictional Scan has demonstrated two main processes that can be considered to recover these insepar...
AI summary The document outlines two main processes for recovering inseparable costs from transmission system users in Nova Scotia: incorporating recovery into the OATT or levying a Direct Charge to Market Participants. It also discusses integrated and standalone charge options, referencing the Demand Side Management model and the need for further decisions on billing determinants and relevant MPs.
1.a. New schedule in OATT MPs: A charge levied via the OATT would most likely charge the same MPs as the current Nova Scotia Power System Operator ("NSPSO") [21](#page-14-1) OATT, which are domestic (network 21 NSPSO is a department within...
AI summary The document discusses the introduction of a new schedule in the Open Access Transmission Tariff (OATT), outlining potential changes in how Market Participants (MPs) are charged, including the possibility of volumetric, peak, or fixed charges. It also describes a true-up mechanism for adjusting future rates based on forecast and actual revenue differences, drawing from practices used by other ISOs and NSP's DSM rider.
2.b. Consolidated Direct Charge MPs: A charge outside of the OATT that follows the existing framework established by EfficiencyOne [33](#page-19-1) would instead have a simpler billing structure than Option 2.a. The entire IESO revenue req...
AI summary The consolidated direct charge involves billing the entire IESO revenue requirement to NSP, who then allocates these costs to MPs. This approach simplifies billing compared to other options, but requires decisions on allocation among MPs. True-up adjustments would be based on budget variations. EfficiencyOne's costs are recovered through charges billed to NSP, and RtR suppliers will also be charged DSM fees.
Allocation adjustment design The allocation adjustment will resolve any over/under-forecast of MP load share. This provides a similar allocation to a usage-based charge, but without the risk of the IESO over/under-recovering due to unexpec...
AI summary The allocation adjustment design aims to correct over or under-forecasting of MP load share. It adjusts charges based on actual energy consumption relative to forecasts, ensuring fair distribution without the risk of over or under-recovery by the IESO.
Allocation adjustment: Difference of forecast and actual MP load share In Year 3, Year 2 load per MP is known, hence the difference between the forecast load share in Year 2 and actual load share for each MP can be determined. Source: FTI...
AI summary The document discusses an allocation adjustment mechanism in Year 3, based on the difference between forecast and actual load share for Market Participants (MPs). It outlines how revenue instability caused by MPs exiting or entering during the year can be addressed through adjustments to monthly fixed charges or collateral requirements. The adjustments ensure that charges are reconciled among MPs, with the total sum of adjustments equaling zero.
Flexibility for future changes The flexibility for future changes criterion illustrates how the recovery mechanism is adaptable to changes such as i) an increase in transmission service competition; ii) an increasing IESO role (future ener...
AI summary The flexibility for future changes criterion highlights the adaptability of the recovery mechanism to potential changes, such as increased transmission service competition, evolving IESO roles, and shifts in the market participant landscape, including greater Renewable-to-Retail participation and special power purchase agreements.
Economic principles The economic principles criterion assesses i) the extent to which the recovery mechanism applies cost causation effectively, and ii) whether it encompasses non-distortionary economic principles, such as the introduction...
AI summary The economic principles criterion evaluates the recovery mechanism's ability to apply cost causation effectively and incorporate non-distortionary principles. The assessment is positive ('green') for all options due to the relatively small IESO fee compared to other electricity system charges. NSP uses SAE models to forecast load and develop energy forecasts for the province.