AI-generated summary
· Application · 04/14/2015
EfficiencyOne files revised Excel spreadsheet in response to NSPI information request IR-17 in 2016–2019 DSM Supply Agreement proceeding.
AI summary
- The sole document in this filing event is a revised response to Nova Scotia Power Inc.'s Information Request IR-17, Attachment 2, submitted by Efficiency One (E1) in Matter M06733.
- The document is an Excel spreadsheet of approximately 130,000 tokens, making it too large to read in full; only its existence and label are confirmed — no internal content, figures, or methodology could be reviewed.
- The proceeding concerns approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne and NSPI covering the 2016-2018 DSM Plan period (2016–2019).
- Because the attachment's contents are entirely unreadable at this time, no specific data, assumptions, cost estimates, or program details from the spreadsheet can be reported.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- E-9 Revised Response by E1 to NSPI IR-17, Attachment 2- Excel Spreadsheet