Home M08929 Digest
AI-generated summary · Application · 02/16/2021

NSPI files Response to Comments on its 2020 Integrated Resource Plan, addressing stakeholder feedback, FAM audit action items, and DSM avoided-cost methodology.

M08929 · P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization
AI summary
  • Nova Scotia Power submitted document N-18 responding to comments on its 2020 Integrated Resource Plan IRP, characterizing the overall reception from Board Counsel's consultants and interested parties as largely positive regarding process quality and analytical rigour.
  • NSPI addressed all outstanding action items from the 2016/2017 Fuel Cost Adjustment audit (Bates White), covering nine sub-recommendations under Recommendation IX-1, including regular IRP planning cycles, optimal planning-reserve margin determination, transparent peak-load forecasting, and effective load-carrying capability assessment for wind resources.
  • The filing resolves specific audit items related to the Biomass Chp Cost Scenarios (Recommendation XIV) and combustion-turbine replacement economics, with NSPI asserting each item is fully addressed within the 2020 IRP framework.
  • A dedicated appendix presents Demand Side Management avoided-cost results using the Difference-in-Revenue-Requirement method, comparing a 'No New DSM' baseline scenario against the DSM plan to quantify avoided capacity and energy costs across multiple load and peak comparisons.
  • NSPI's response matrix (Appendix A) documents replies to comments from multiple Stakeholder Engagement parties — including Bates White, EfficiencyOne, Heritage Gas, Port Hawkesbury Paper, Sierra Club Canada Foundation, and Synapse — while the conclusion thanks the Board for enabling the extensive consultation process.

Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

What was filed

Documents filed on this day

  • N-18 Response to Comments - NSPI exhibits