AI-generated summary
· Rir · 06/19/2024
NSPI files responses to multi-party information requests on its 2024 Load Forecast Report, revealing key assumptions on heat pump saturation, EV charging, Renewable to Retail load shifts, and time-varying pricing impacts.
AI summary
- Nova Scotia Power Inc confirms that projected Net System Requirement declines in 2025–2026 are primarily driven by customer migration to the Licensed Retail Supplier under the Renewable Energy Renewable to Retail program and a shift of municipal load to third-party supply, not underlying demand weakness.
- The forecast assumes near-universal Heat Pumps adoption (100% saturation by 2050) based on federal and provincial net-zero targets, with approximately 20,000–21,000 residential installations per year in the near term; actual 2023 installations of 20,874 aligned closely with the prior year's forecast.
- Ev Charging Control peak impact is modelled at 0.9 kW/vehicle (managed charging basis, 70% managed/30% unmanaged), based on E3 estimates rather than Smart Grid Nova Scotia pilot data, with province-wide extrapolation still requiring a larger customer data pool.
- Time Varying Pricing (TOU and CPP) peak reduction forecasts reference Figure 56 of the report; NS Power expects the full 35 MW of Advanced Metering Infrastructure-related peak savings to be realized by 2028–2029, with stakeholder engagement ongoing to set the longer-term TVP deployment plan.
- Commercial and industrial Strategic Electrification forecasts were revised downward from the 2023 report after a review of past forecasts against actuals showed prior project-completion estimates were too optimistic; the Forecasting Methodology also retains a COVID-adjustment variable for commercial sales given continued flat energy sales through 2023.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- N-2 NSPI (CA) RIR-1 to RIR-9
- N-4 NSPI (NSUARB) RIR-1 to RIR-26
- N-5 NSPI (SBA) RIR-1 to RIR-10
- N-6 NSPI (Synapse) RIR-1 to RIR-54 - Redacted
- N-6(C) NSPI (Synapse) RIR-1 to RIR-54 - Confidential
- N-6(C)-(i) Excel Attachment - Synapse IR-45 Att 3 - Confidential
- N-6-(i) Multiple Excel Attachments - Synapse