152 matters — click to drill in
Where this is discussed
M130482026
2 passages · 1 doc
M130422026
42 passages · 6 docs
M130082026
33 passages · 1 doc
M129592026
3 passages · 3 docs
M129622026
2 passages · 1 doc
M129472026
8 passages · 4 docs
M129322026
5 passages · 2 docs
M129162026
19 passages · 1 doc
M128982026
1 passages · 1 doc
M129002026
1 passages · 1 doc
M128822026
18 passages · 3 docs
M128872026
6 passages · 2 docs
M128832026
4 passages · 1 doc
M128742026
1 passages · 1 doc
M128612026
64 passages · 11 docs
M128592026
1 passages · 1 doc
M128572026
1 passages · 1 doc
M128542026
22 passages · 3 docs
M128422026
13 passages · 4 docs
M128412026
7 passages · 4 docs
M128392026
3 passages · 3 docs
M128432026
2 passages · 1 doc
M128402026
1 passages · 1 doc
M128352026
86 passages · 5 docs
M128322026
1 passages · 1 doc
M128082026
1 passages · 1 doc
M127992026
2 passages · 1 doc
M127952026
54 passages · 9 docs
M127862026
1 passages · 1 doc
M127802026
280 passages · 48 docs
M127822026
41 passages · 19 docs
M127782026
9 passages · 3 docs
M127832026
9 passages · 4 docs
M127792026
1 passages · 1 doc
M127492026
2 passages · 1 doc
M127462026
13 passages · 1 doc
M127422026
9 passages · 3 docs
M127452026
4 passages · 2 docs
M127372026
6 passages · 2 docs
M127322026
15 passages · 8 docs
M127252026
5 passages · 2 docs
M127192026
2 passages · 1 doc
M127172026
10 passages · 5 docs
M126962026
140 passages · 9 docs
M126942026
7 passages · 3 docs
M126862026
24 passages · 10 docs
M126872026
8 passages · 2 docs
M126852026
2 passages · 2 docs
M126812026
3 passages · 2 docs
M126652026
82 passages · 3 docs
M126632025
38 passages · 11 docs
M126612025
93 passages · 24 docs
M126602025
36 passages · 3 docs
M126412025
5 passages · 4 docs
M126192025
168 passages · 20 docs
M126232025
5 passages · 1 doc
M126112025
6 passages · 5 docs
M126002025
12 passages · 4 docs
M125912025
79 passages · 6 docs
M125882025
72 passages · 20 docs
M125932025
32 passages · 6 docs
M125922025
16 passages · 6 docs
M125902025
5 passages · 4 docs
M125962025
3 passages · 2 docs
M125772025
7 passages · 1 doc
M125792025
1 passages · 1 doc
M125582025
21 passages · 4 docs
M125542025
1 passages · 1 doc
M125512025
109 passages · 21 docs
M125502025
9 passages · 4 docs
M125242025
3 passages · 3 docs
M125212025
1 passages · 1 doc
M125082025
5 passages · 3 docs
M124992025
6 passages · 3 docs
M124842025
1 passages · 1 doc
M124632025
5 passages · 3 docs
M124512025
803 passages · 61 docs
M124552025
3 passages · 3 docs
M124382025
1 passages · 1 doc
M124362025
3 passages · 1 doc
M124142025
25 passages · 9 docs
M124122025
14 passages · 10 docs
M124182025
4 passages · 3 docs
M124172025
3 passages · 1 doc
M124202025
2 passages · 2 docs
M123942025
51 passages · 9 docs
M123702025
7 passages · 3 docs
M123712025
7 passages · 1 doc
M123722025
2 passages · 2 docs
M123732025
2 passages · 2 docs
M123492025
83 passages · 16 docs
M123502025
6 passages · 3 docs
M123392025
51 passages · 10 docs
M122902025
1 passages · 1 doc
M122822025
189 passages · 41 docs
M122792025
1 passages · 1 doc
M122732025
5 passages · 4 docs
M122472025
70 passages · 27 docs
M122492025
17 passages · 8 docs
M122412025
1 passages · 1 doc
M121772025
46 passages · 2 docs
M121862025
40 passages · 2 docs
M119902024
5 passages · 1 doc
M119832024
2 passages · 1 doc
M119272024
140 passages · 13 docs
M117642024
162 passages · 14 docs
M116892024
90 passages · 16 docs
M116772024
2 passages · 2 docs
M116302024
55 passages · 3 docs
M113072023
171 passages · 22 docs
M112212023
48 passages · 5 docs
M111082023
188 passages · 18 docs
M106532022
31 passages · 1 doc
M105692022
80 passages · 15 docs
M104732022
362 passages · 20 docs
M105042022
90 passages · 5 docs
M101002021
1 passages · 1 doc
M090962019
180 passages · 16 docs
M089292018
1196 passages · 25 docs
M088882018
5 passages · 4 docs
M086042018
24 passages · 4 docs
M080592017
137 passages · 22 docs
M075442016
74 passages · 5 docs
M071512016
2 passages · 2 docs
M067332015
38 passages · 15 docs
M048192012
75 passages · 22 docs
M037142010
1 passages · 1 doc
M036832010
1 passages · 1 doc
M036692010
54 passages · 11 docs
M036662010
165 passages · 14 docs
M036322010
734 passages · 85 docs
M036212010
1 passages · 1 doc
M036262010
1 passages · 1 doc
M035892010
82 passages · 6 docs
M035112010
1 passages · 1 doc
M035062010
1 passages · 1 doc
M034522010
2 passages · 1 doc
M034412010
14 passages · 5 docs
M034292010
5 passages · 1 doc
M034302010
3 passages · 1 doc
M034282010
1 passages · 1 doc
M034152010
1 passages · 1 doc
M034172010
1 passages · 1 doc
M034132010
525 passages · 20 docs
M033472010
16 passages · 1 doc
M033242010
16 passages · 6 docs
M032322010
1 passages · 1 doc
M031542010
2 passages · 2 docs
M030972010
16 passages · 6 docs
M030832010
7 passages · 1 doc
M030912010
3 passages · 2 docs
M030842010
2 passages · 2 docs
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Q1 2026/2027 Quarterly Report
Open
Procurement Administrator - Power Advisory - Application for Approval of the Green Choice Power Purchase Agreement
Open
Nova Scotia Power Inc. - RtR Market Elements Application - Approval of necessary tariffs, Terms and Conditions
Open
Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251
Open
Nova Scotia Power Inc. - CI C0068659 – TRE5 – IP-LP Turbine Refurbishment - $2,963,160 (ATO)
Open
NSPI DRO Appeal - Meter and Power Consumption - Bernard Wentzell
Open
Nova Scotia Power Inc. (NSPI) - Time-Varying Pricing Pilot Program - 2024/25 (Year Four) and 2025/26 (Year Five) Evaluation Reports
Open
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 10-Year System Outlook Report for 2026
Open
Nova Scotia Power Inc. - Distribution Routines CI Various- D055 – Planned Replacement of Deteriorated Equipment (ATO) - $11,359,8222025 ACE Plan – Routine Capital - Authorization to Overspend (ATO):Distribution Routines – Non-Confidential • D055 – Planned Replacement of Deteriorated Equipment: ATO amount $11,359,822
Open
Nova Scotia Power Inc. - CI C0083451 - Seton Ridge Underground Network - $3,656,609 (U&U)Unforeseen & Unbudgeted (U&U) Capital Items:C0083451 - Seton Ridge Underground Network - $3,656,609 $0 spent as at March 31, 2026 Partially Confidential
Closed
North American Electric Reliability Corporation (NERC) - First Quarter 2026 - Application for Approval of Reliability Standards
Open
Nova Scotia Power Inc. - 2025 Short Run Marginal Cost (SRMC) Test to Rates Report
Closed
Nova Scotia Power Inc. - Affiliate Code of Conduct Report for 2025
Open
Lunenburg Electric Utility Capital Approval 2026 Transformer Project
Closed
Nova Scotia Power Inc. (NSPI) - 2026 Load Forecast Report
Open
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Quarterly Report
Closed
NSPI DRO Appeal - Billing Issues - Brad Neville
Open
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2026 Integrated Resource Planning (IRP)
Open
Nova Scotia Power Inc. - CI C0083591 – IR746 Petpeswick Community Solar - $0 (U&U)2026 Q1 Capital Reports
Closed
Nova Scotia Power Inc. - CI C0083589 – IR751 Brooklyn Community Solar - $0 (U&U)2026 Q1 Capital Reports
Closed
Nova Scotia Power inc. - CI C0084033 – RC SCR Bridge 10.10 Refurbishment - $1,008,9412026 Q1 Capital Reports
Closed
Nova Scotia Power Inc. CI C0044172 – L7005 Canso Crossing Vibration Mitigation - $2,431,095 (P&A)2026 Q1 Capital Reports
Closed
Nova Scotia Power inc. - CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 (U&U)2026 Q1 Capital Reports
Closed
Nova Scotia Power Inc. - Annual and Regulated Financial Statements - 2025
Open
NSP Maritime Link Inc. (NSPML) - 2025 Affiliate Code of Conduct Report
Open
NSP Maritime Link Inc. (NSPML) - 2026 Q1 Quarterly Report
Closed
Nova Scotia Power Inc. - CI C0080101 – 539N-201 Big Island Subsea Cable Replacement - $4,388,679
Closed
Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000
Closed
Nova Scotia Power Inc. - 2025 Storm Restoration Cost Report
Closed
EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application
Open
Nova Scotia Power Inc. - Commercial Net Metering Program - 2025 Annual Report �
Closed
Nova Scotia Power Inc. - Annual Interconnection Processes Proceeding Report
Open
Nova Scotia Power Inc. - Regulation 3.6 - 2025 Net Metering Report
Closed
NSP Maritime Link (NSPML) - Audited Financial Statements - December 31, 2025 and 2025 Cost Containment Report
Closed
NSPI DRO Appeal - Billing Issues - Christine Cameron
Open
Nova Scotia Power Inc. - CI C0064966 – Tusket Tidal Pool Fish Passage - $1,763,971
Closed
Nova Scotia Power Inc. - 2025 Annual FAM Report (Fuel Adjustment Mechanism)
Closed
Nova Scotia Power Inc. - CI C0080671 – LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384
Closed
NSPI DRO Appeal - Billing Issues - Emily Martin
Closed
NSPI DRO Appeal - Meter Issues - Hunter Cooling
Closed
Nova Scotia Power Inc. - 2025 Wholesale and Renewable to Retail Market Report
Closed
Nova Scotia Power Inc. - CI C0059483 – 83V L-5017 and L-5046 Rebuild Tap - $1,558,116
Closed
North American Electric Reliability Corporation (NERC) - Fourth Quarter 2025 - Application for Approval of Reliability Standards
Open
NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
Open
Nova Scotia Power Inc. - Cold Weather Event, January 23-26, 2026
Closed
Nova Scotia Power Inc. - Community Solar Program – 2025 Report
Closed
Nova Scotia Power Inc. - 2025 COMFIT Annual Report
Closed
Nova Scotia Power Inc. - Green Choice Program – 2025 Reporting Requirements
Closed
Renewall Energy Inc. - Compliance Reporting
Closed
Nova Scotia Power Inc. - Fuel Adjustment Mechanism (FAM) Audit, conducted by Bates White for 2024 and 2025
Open
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2026/2027 Revenue Requirement and Fees Application
Open
Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper
Open
Nova Scotia Power Inc. - Natural Gas Report - November 1, 2024 to October 31, 2025
Closed
NSPI Complaint - Solar Billing Process - Bonnie MacLean
Closed
Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
Closed
Northeast Power Coordinating Council (NPCC) - Fourth Quarter 2025 for Approval of Revised Regional Reliability Criteria
Closed
NSPI DRO Appeal - Solar Billing Process - David Rossiter
Closed
Nova Scotia Power - Cybersecurity Accountability IN THE MATTER OF AN INQUIRY about the impact of the cyber incident on NOVA SCOTIA POWER INCORPORATED’s collection and retention of customer information, customer service and communications, billing processes and regulatory matters
Open
Nova Scotia Power Inc. - CI C0032664 – Energy Control Centre – Optimization Tools - $7,486,068
Closed
Nova Scotia Power Inc. - CI C0053699 – Renewable to Retail Implementation - $5,644,468
Closed
Nova Scotia Power Inc. - CI C0053696 – ECC Wind Integration - $4,428,335
Closed
Nova Scotia Power Inc. - CI 47751 – ECC Dynamic Line Rating Implementation - $2,148,364
Closed
Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884
Closed
Nova Scotia Power Inc. - CI C0080228 – HYD Hollow Bridge Generator Refurbishment - $2,587,170 (U&U)
Closed
North American Electric Reliability Corporation (NERC) - Third Quarter 2025 - Application for Approval of Reliability Standards
Closed
EfficiencyOne - 2025 Q3 Demand Side Management (DSM) Report
Closed
Review of NS Power's Five-Year Reliability Plan 2025-2029
Open
NSPI DRO Appeal - Billing Issues - Ralph Doncaster
Open
Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs)
Closed
To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)
Closed
Nova Scotia Power Inc. - Concentric FERC Order 2023 Report
Open
Nova Scotia Power Inc. - Application for 2026 DSM Cost Recovery Rider (DCRR)
Closed
Nova Scotia Power - CI C0080112 – HYD Big Falls Unit 6 Rotor Re-Insulation (U&U) - $1,025,626
Closed
Nova Scotia Power Inc. - Application for approval of 2025/26 Time Varying Pricing (TVP) Tariffs
Closed
NSPI DRO Appeal - Solar Energy Consumption Dispute - Pratima Devichand
Closed
NSPI Complaint - Solar Energy Producers Regulations - Abu Augustine
Closed
Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
Closed
Nova Scotia Power Inc. - CI C0059783 – HYD Upper Lake Falls 2 Overhaul – $1,582,014
Closed
EfficiencyOne - 2025 Q2 Demand Side Management (DSM) Report
Closed
North American Electric Reliability Corporation (NERC) - Second Quarter 2025 - Application for Approval of Reliability Standards
Closed
NSPI DRO Appeal - Solar Billing - Karen Chetwynd
Closed
Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Proposed expenditure and revenue requirements for test year ending March 31, 2026
Closed
Nova Scotia Power Inc. - CI 49036 – HYD - Avon 2 Controls Upgrade - $1,073,463
Closed
Nova Scotia Power Inc. - CI C0071528 – FLISR Implementation – $4,638,245
Closed
Nova Scotia Power Inc. - CI C0067183 – TUC Wharf Access Bridge Replacement - $2,426,669 (U&U)
Closed
NSP Maritime Link Inc. - 2026 Assessment Application - NSPML
Closed
Nova Scotia Power Inc. - CI C0061003 – POA LP HP IP Turbine Refurbishment – $4,861,261
Closed
Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405
Closed
Nova Scotia Power Inc. - CI C0067906 – POA Boiler Refurbishment 2025 – $1,218,254
Closed
Nova Scotia Power Inc. - CI C0067908 – POA Boiler Refractory Refurbishment 2025 – $1,378,466
Closed
Nova Scotia Power Inc. (NSPI) - 2025 Load Forecast Report
Closed
Nova Scotia Power Inc. - 2024 Short Run Marginal Cost (SRMC) Test to Rates Report
Closed
Renewall Energy Inc. - Request for Tariffs for the Renewable to Retail Market
Closed
EfficiencyOne - 2025 Q1 Demand Side Management (DSM) Report
Closed
EfficiencyOne - New Benefit Cost Analysis Test for Evaluating Demand Side Management (DSM) Plans Application for Approval of New Benefit Cost Analysis Test for Evaluating Demand Side Management (DSM) Plans
Closed
Nova Scotia Power Inc. - CI C0051136 – TUC2 HP/IP Turbine Refurbishment – $5,965,028 (ATO)
Closed
Board Inquiry into Nova Scotia Power's Cybersecurity Incident
Open
Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update
Closed
EfficiencyOne - 2026 DSM Extension ApplicationIN THE MATTER OF An Application by EfficiencyOne for Approval of the 2026 DSM Extension for Demand-Side Management Activities between EfficiencyOne and Nova Scotia Power Inc., and for Approval of the Amendment to the 2023-2025 Demand-Side Management Purchase Agreement between EfficiencyOne and Nova Scotia Power Inc.
Closed
EfficiencyOne - 2024 Audited Financial Statements - December 31, 2024
Closed
Nova Scotia Power Inc. - Distributed Energy Resource (DER) Integration Roadmap
Open
EfficiencyOne - 2024 DSM Annual Progress Report and 2024 DSM Evaluation Reports
Closed
Nova Scotia Power Inc. - WACC and AFUDC Rates Application for 2025
Closed
EfficiencyOne 2024 Q3 Demand Side Management (DSM) Report
Closed
Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
Closed
Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024
Closed
Nova Scotia Power Inc. (NSPI) - 2024 Load Forecast Report
Closed
EfficiencyOne - 2023 Audited Financial Statements - December 31, 2023
Closed
EfficiencyOne - 2023 DSM Annual Progress Report and 2023 DSM Evaluation Reports
Closed
P-884 - Nova Scotia Power Inc. - 2023 Evergreen Integrated Resource Plan (IRP) - Action Plan and Roadmap
Closed
P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2023
Closed
P-194 - Nova Scotia Power Inc. (NSPI) - 2023 Load Forecast Report
Closed
P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2022
Closed
P-194 - Nova Scotia Power Inc. (NSPI) - 2022 Load Forecast Report
Closed
E-ENS-R-22 EfficiencyOne 2023-2025 Demand Side Management (DSM) Plan Application
Closed
P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) Action Plan Update
Closed
E-ENS-F-21 - EfficiencyOne - 2020 Audited Financial Statements - December 31, 2020
Closed
Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan
Closed
P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization
Closed
E-ENS-G-18 - EfficiencyOne - Evaluation of DSM Programs - Application to allow inclusion of Non-Energy BenefitsEfficiencyOne - Application for approval of the use of Non-Energy Benefits within Cost-Effectiveness Testing
Closed
E-ENS-R-18 - EfficiencyOne - 2019 Demand Side Management (DSM) Plan Application, 2017 Annual Progress Report and 2017 Evaluation Reports
Closed
Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization
Closed
E-ENS-R-16 - EfficiencyOne - Incentive Setting Methodology Review and RecommendationsGroup with M06733
Closed
E-R-15 - Nova Scotia Power Inc. (NSPI) - 2016-2018 DSM Plan - NSPI Cost Allocation Proposal10/30/2015
Closed
E-ENS-R-15 - EfficiencyOne Application for approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between Efficiency One and Nova Scotia Power Inc.- NSPI - 2016-2019 DSM Plan IN THE MATTER OF AN APPLICATION for Approval of a Supply Agreement for electricity efficiency and conservation activities between EfficiencyOne and Nova Scotia Power Incorporated, the establishment of a final agreement between the parties, and approval of a 2016-2018 Demand Side Management Resource Plan
Closed
E-ENSC-R-12 - Efficiency Nova Scotia Corporation - Application for Approval of its Demand Side Management (DSM) Plan for 2013 - 2015
Closed
CI# 39406 - P-510 - NSPI WO - U&U Dickie Brook Unit #1 - $601,706$82K spent to date
Closed
P-141 - Nova Scotia Power Inc. - Request Approval of the 2011 Annually Adjusted Rates (AAR's)Request approval of 2011 Annually Adjusted Rates: 1) Load Following (LF) portion of the GRLF Tariff; 2) One Part Real Time Price (1P-RTP) Fixed Cost Adders; 3) Wholesale Market Back-Up/Top-up (BUTU) Tariff; 4) Wholesale Market Non-Dispatchable Supplier Spill (Spill) Tariff
Closed
E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012A request by Efficiency Nova Scotia for approval of a $43.7 million Demand Side Management plan for the 2012 operating year. (Also see Matter Nos. M04538 and M04539)
Closed
P-188 - NSPI Regulation 3.6 - Net Metering - Request approval of the revised Regulation 3.6Enhanced net metering service, in compliance with recent legislative changes to the Electricity Act.
Closed
BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523
Closed
CI# 38724 - P-128.10 - NSPI WO - TRE 5 Superheater, Reheater and Boiler Upgrades - $796,383
Closed
CI# 38943 - P-128.10 - NSPI WO - LIN1 Boiler Refurbishment - $1,653,592
Closed
CI# 40103 - P-510 - NSPI WO - Load Control Demonstration Project (U&U) - $4,293,793
Closed
CI# 38856 - P-128.10 - NSPI WO - L7011 Deteriorated Replacements - $2,055,736
Closed
CI# 38942 - P-128.10 - NSPI WO - TUC-Unit #3 Generator Rotor Rewind - $1,798,080
Closed
ENSC-TRAN - Efficiency Nova Scotia - Nova Scotia Power Inc. - Demand Side Management Transition Plan
Closed
P-884 - NSPI - 2009 IRP Update - Action Plan Status Report (1st Progress Report)
Closed
CI# 28866 - P-128.10 - NSPI WO - TRE#6 Low Nox Combustion Firing System $4,106,621
Closed
CI# 28867 - P-128.10 - NSPI WO - LIN Unit#1 Low Nox Combustion Firing System $3,875,373
Closed
CI# 39623 - P-510 - NSPI WO - LIN-U&U CW Pump Refurbishment $381,736
Closed
NSPI CI# 38819 - $7,452,511 - 51V Tremont Circuit Breaker & Bus
Closed
NSPI CI# 11004 - $1,990,631 - Canaan Rd. Circuit Breaker Additions
Closed
CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project
Closed
P-194 - NSPI - 10 Year System Outlook 2010-2019 - June 30, 2010
Closed
E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria
Closed
P-401.32 - Nova Scotia Power Inc. (NSPI) - Relay Testing Report - 2009Review of Report
Closed
P-111.6 - Nova Scotia Power Inc. - Approval of NSPI's Amended Accounting Policy and Procedures Manual. (US GAAP)Conversion to US Generally Accepted Accounting Principles for financial reporting purposes.
Closed
CI# 28098 - P-128.07 - NSPI WO - Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
Closed
CI# 38834 - P-128.10 - NSPI WO - TRE5 - Turbine Upgrades LP/IP/HP - $5,202,549
Closed
CI# 33942 - P-510 - NSPI WO - Coon Pond Pipeline Replacement - $2,075,549
Closed
CI# 30954 - P-128.10 - NSPI WO - LIN3 - ESP Gas Flow Modifications - $1,473,990
Closed