21 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 % Change in 2024 Total System Requirement (GWh) Net of LRT/ELIADC 9,968 10,102 9,837 9,970 10,252 10,342 9,884 9,940 10,178 10,469 10,561 0.9% versus Customers Average MC adj for Li...
AI summary The table presents data on total system requirements, average marginal costs, unit revenues, and variances between these metrics from 2014 to 2024. It highlights changes in fuel costs, system requirements, and the variance of unit revenues from marginal costs over the years.
e also significantly lower than unit revenues in each calendar year. This is because the unit revenues are reflective of total costs of service of the four DATE FILED: June 27, 2025 Page 12 of 20 functional areas of generation, transmissio...
AI summary The text discusses the relationship between marginal generation costs and unit revenues, noting that marginal costs typically do not exceed unit revenues due to the inclusion of fixed costs. However, in 2022, marginal costs surged above average system fuel costs due to geopolitical events. The average system marginal cost increased by 14.7% from 2023 to 2024, primarily due to changes in the generation mix and increased load.