HomeRenewable EnergyM12623Evidence
Topic/Matter Intersection

Topic:"Renewable Energy" in M12623

Matter: Northeast Power Coordinating Council (NPCC) - Fourth Quarter 2025 for Approval of Revised Regional Reliability Criteria
5 passages 1 document

Renewable Energy across all matters →

N-1Application - Directory 5 filing 5 passages
Version History p. pp. 10-13
Version History Version Date Action Change Tracking (New, Errata or Revisions) 1 12/2/2010 New 2 10/11/2012 Revised/clarified Criteria: (radial source cont., time zero) Revisions 3 9/27/2019 NERC style reformat, Revised/clarified Criteria...

AI summary The document outlines the version history and table of contents for a regulatory proceeding related to reserve criteria and reliability standards. It includes multiple revisions and errata corrections over time, with references to NERC and NPCC standards.

Section 152 p. p. 76
First Pass – NYISO is provided 600 MW of assistance. These shares are allocated equally, 200 MW each, among the other three participants – including PJM. Second Pass – PJM is provided 200 MW of assistance. These shares are allocated equall...

AI summary The text discusses the allocation of generation assistance among Balancing Authorities, including NYISO and PJM, and the restoration of ACE (Area Control Error) after a contingency. It also references the SAR (Simultaneous Activation of Ten-Minute Reserve) procedure and the impact on generation levels.

IESO IESO NE NE PJM PJM NY NY Tot Tot p. p. 76
IESO IESO NE NE PJM PJM NY NY Tot Tot Time Sch ACE Sch ACE Sch ACE Sch ACE Sch ACE Pre-contingency 0 0 0 0 -1200 0 +1200 0 0 0 Contingency 0 0 0 0 -1200 0 +1200 -1600 0 -1600 PJM/NY Schedule change 0 0 0 0 0 -1200 0 -400 0 -1600 No respons...

AI summary The table details the changes in ACE (Area Control Error) across different regions (IESO, NE, PJM, NY) before and after a contingency, including the response through SAR (Simultaneous Activation of Ten-Minute Reserve) and the resulting adjustments in schedules. Example 3 illustrates a scenario where PJM and NYISO purchase 200 MW from Quebec, while NE purchases 1200 MW.

IESO NE NE PJM PJM NY NY Tot Tot p. p. 76
IESO NE NE PJM PJM NY NY Tot Tot Time Sch IESO Sch ACE Sch ACE Sch ACE Sch ACE Pre-contingency 0 0 +400 0 -200 0 -200 0 0 0 Contingency 0 0 +400 -1600 -200 0 -200 0 0 -1600 PJM/NY/NE schedule change 0 0 0 -1200 0 -200 0 -200 0 -1600 No res...

AI summary The document provides a table and example illustrating the distribution of energy purchases and assistance during a contingency event, involving ISO-NE, PJM, and NYISO purchasing 700 MW each from Quebec on Sandy Pond. It outlines the initial shares, assistance sought, and total generation picked up after SAR is canceled.

Section 162 p. p. 76
First Pass – ISO-NE is provided 350 MW of assistance. These shares are allocated equally, 117 MW each, among the other three participants. Second Pass – NYISO is provided 350 MW of assistance. These shares are allocated equally, 117 MW eac...

AI summary The text discusses the distribution of 350 MW of assistance among three participants in different balancing authority scenarios, including ISO-NE, NYISO, and PJM. It also references the restoration of composite NPCC/PJM ACE and the cancellation of the SAR procedure, showing the additional generation after these actions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →