Home›Renewable Energy›M13007›Evidence
Topic/Matter Intersection

Topic:"Renewable Energy" in M13007

Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - Fee Recovery Mechanism Application
15 passages 8 documents

Renewable Energy across all matters →

N-1Fee Recovery Mechanism Application 2 passages
1 Figure 3 – ISO Core Costs Flow Chart p. pp. 9-10
1 Figure 3 – ISO Core Costs Flow Chart 2 - Source: FTI Consulting Analysis.[6](#page-10-0) 3 - 4 Notes: DTS = Demand Transmission Service, BSUoS = Balancing Services Use of System, - 5 GMC = Grid Management Charge, NEM National Electricity...

AI summary Figure 3 presents an ISO Core Costs Flow Chart, which outlines the flow of costs within the energy system. The chart is based on FTI Consulting's analysis and includes notes on terms such as DTS, BSUoS, and GMC. The research conducted by FTI has influenced the design of the Proposed Mechanism.

Flexibility for future changes p. p. 21
Flexibility for future changes Adaptable to changes, such as: - Competitive transmission - More IESO roles (energy/capacity markets) - Shift in MP landscape (e.g. more RtR participation, or special PPAs)

AI summary The text discusses flexibility for future changes in the energy sector, including competitive transmission, expanded roles for the Independent Energy System Operator (IESO), and shifts in the market participant (MP) landscape such as increased participation in real-time retail (RtR) or special power purchase agreements (PPAs).

N-1-(i)Appendix 1 - ISO Enduring Fee Cost Recovery Jurisdictional Scan 2 passages
CHARACTERISTIC STRUCTURE JURISDICTION AGE RESOURCE MIX p. p. 24
CHARACTERISTIC STRUCTURE JURISDICTION AGE RESOURCE MIX Large Incumbent(s) Single Province within a Nation Newly Restructured High Renewables Source: FTI Analysis, logos from ISO websites.

AI summary The table outlines a jurisdiction with a large incumbent, single province within a nation, newly restructured, and characterized by high renewables in its resource mix. The source is FTI Analysis, with logos from ISO websites.

Section 47 p. pp. 24-25
which change the types and volumes of grid services required to keep the system within safe operating limits. This is increasingly challenging when the penetration is high across the wider synchronous grid, as is often the case for AEMO. W...

AI summary The text discusses the challenges of maintaining grid stability with high penetration of renewable energy, referencing AEMO and other ISOs. It also mentions Bonneville's participation in SPP's day-ahead market and provides links to various electricity grid and generation resources.

N-1-(ii)Appendix 2 - ISO Enduring Fee Cost Recovery Recommendation 2 passages
Flexibility for future changes p. p. 20
Flexibility for future changes - Adaptable to changes, such as: - Competitive transmission - More IESO roles (energy/capacity markets) - Shift in MP landscape (e.g. more RtR participation, or special PPAs)

AI summary The text discusses the need for adaptability in the energy sector, highlighting the importance of flexibility in response to changes such as competitive transmission, expanded IESO roles, and shifts in the market participant landscape, including increased Renewable-to-Retail participation and special Power Purchase Agreements.

Section 45 p. p. 29
Note: (1) High renewables criteria based on Nova Scotia's goal for 80% clean electricity by 2030 as described in the Clean Power Plan [(link)](https://novascotia.ca/clean-power-plan/). 36 FTI Consulting LLP, ISO Cost Recovery Mechanism: Ju...

AI summary The document discusses a jurisdictional scan conducted by FTI Consulting LLP for the Nova Scotia Independent Energy System Operator (IESO NS), examining how ISOs charge load-serving market participants. The scan found that most ISOs charge primarily based on energy consumption, with some using peak usage as a determinant.

N-5IESO (LEI) RIR 1 to 10 1 passage
Preamble p. pp. 38-45
Additionally, it should be noted that all benchmarked ISOs have a wider variety of roles and more responsibilities than IESO Nova Scotia, all being more mature and established organizations. b) The size of an ISO does not necessarily impac...

AI summary The text discusses the role and responsibilities of the Nova Scotia Independent Energy System Operator (IESO Nova Scotia) compared to other ISOs, noting that their size does not necessarily affect the transferability of charge structures. It also references a figure and discussion about the province's future resource mix aligned with clean energy policies.

N-7IESO (NSEB) RIR 1 to 22 1 passage
NON-CONFIDENTIAL p. p. 40
NON-CONFIDENTIAL 97 d) As shown in the FTI Jurisdictional Scan, many of the benchmarked ISOs (including ISO 98 NE, CAISO, IESO Ontario and the AESO) charge ISO Core Costs to intertie traders.6 For 99 more detail, see Table 4 of Appendix 1,...

AI summary The text discusses how ISOs in various jurisdictions, including IESO Ontario and AESO, charge intertie traders for ISO Core Costs. It suggests that not charging these traders may shift costs to domestic load and could be politically less acceptable. The text also speculates that if export volumes increase or IESO Nova Scotia takes on additional functions, charging intertie traders could become more relevant.

N-10Evidence - LEI 2 passages
Illustrative granular cost allocation methodology p. pp. 13-14
Illustrative granular cost allocation methodology Utilizing a granular cost allocation approach, the illustrative steps would be as follows: - Allocate all direct costs to each function, i.e., system planning, energy resource procurement,...

AI summary The text discusses a granular cost allocation methodology, emphasizing the allocation of direct and indirect costs to functions like system planning and energy procurement. It highlights the potential for increased electricity exports in Nova Scotia, such as through the Wind West initiative, and suggests that a granular cost allocation approach should be implemented as soon as IESO Nova Scotia reaches Phase 2 steady state.

Example: Town of Lunenburg p. p. 16
(after factoring in Ontario Electricity Rebate) for residential customers. Source: IESO. [Usage Fees](https://www.ieso.ca/corporate-ieso/regulatory-accountability/usage-fees) . Accessed October 2026. 37 IESO Nova Scotia notes that a Renewa...

AI summary The text discusses the implementation of a Renewable to Retail (RtR) Load Serving Entity (LRS) in Nova Scotia, expected to begin operations in December 2026 and reduce NS Power's market share. It also addresses usage-based fees and how they could treat similarly situated customers more equitably compared to current methods. Sources include IESO Nova Scotia and NS Power.

N-11-(i)CV - John D. Wilson 4 passages
PUBLICATIONS
PUBLICATIONS "Urban Areas," with Judith Clarkson and Wolfgang Roeseler, in Gerald R. North, Jurgen Schmandt and Judith Clarkson, The Impact of Global Warming on Texas: A Report of the Task Force on Climate Change in Texas , 1995. "Quality...

AI summary The text lists several publications by the author, including works on global warming, urban ecosystems, energy efficiency incentives, and monopsony behavior in power generation markets. These publications span topics such as climate change, energy policy, and market dynamics.

REPORTS
iation for Smog Prevention, June 2004. - "Mercury in Galveston and Houston Fish: Contamination by Neurotoxin Places Children at Risk," Galveston Houston Association for Smog Prevention, October 2004. - "Big Breaks for Big Polluters: Housto...

AI summary The text lists various reports and publications from organizations such as the Galveston Houston Association for Smog Prevention and the Southern Alliance for Clean Energy, focusing on environmental and energy-related issues including air quality, renewable energy, and energy efficiency in the southeastern United States.

SELECTED PRESENTATIONS
SELECTED PRESENTATIONS - "Clean Energy Solutions for Western North Carolina," presentation to Progress Energy Carolinas WNC Community Energy Advisory Council, February 7, 2008. - "Energy Efficiency: Regulating Cost-Effectiveness," Florida...

AI summary The text lists various presentations and testimonies related to energy efficiency, renewable energy, and utility regulation, primarily in the southeastern United States. These include discussions on cost-effectiveness, integrated resource planning, and energy policy in Florida and the Tennessee Valley Authority region.

EXPERT TESTIMONY
tion of energy efficiency in Georgia Power's 2013 integrated resource plan, including cost effectiveness, rate and bill impacts, and lost revenues, economics of fuel switching and renewable resources. South Carolina PSC Docket No. 2013-392...

AI summary The text outlines expert testimony provided in various regulatory proceedings across multiple states, focusing on energy efficiency, renewable energy, and integrated resource planning. It discusses topics such as the adequacy of renewable energy considerations, reserve margins, system reliability, and the use of solar power as an energy resource.

103392IG (IESO Nova Scotia) IR 1 to 11 1 passage
22 Request IR-5:
22 Request IR-5: - 23 Reference: Application, Section 3.4, p.15, footnote 9; and Section 4, p.36, lines 6-10. - 24 Preamble: IESO-NS notes that a Renewable to Retail (RtR) Licensed Retail Supplier is 25 expected to begin providing electric...

AI summary The document discusses the expected launch of a Renewable to Retail (RtR) Licensed Retail Supplier in December 2026 and clarifies that while this entity is considered an LSE, IESO-NS is not proposing to apply fees to it at this time.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →