Matter: CI# 33942 - P-510 - NSPI WO - Coon Pond Pipeline Replacement - $2,075,549
3 passages 2 documents

Renewable Energy across all matters →

N-1Redacted Work Order 4/30/2010 2 passages
Nova Scotia Utility and Review Board p. pp. 18-19
Nova Scotia Utility and Review Board Mailing address PO Box 1692, Unit "M" Halifax, Nova Scotia B3J 3S3\[email protected] Web www.nsuarb.ca Office 3rd Floor 1601 Lower Water Street Halifax, Nova Scotia B3J 3P6 902 424-4448 t 902 424-39...

AI summary The Nova Scotia Utility and Review Board has approved NSPI's request for approval of a U&U Work Order for the replacement of the Coon Pond Pipeline, valued at $629,936. The replacement is necessary to repair damage and allow the Mill Lake Plant Generating Station to resume operations, with a full replacement planned for 2014.

Why do this project now? p. p. 19
Why do this project now? The pipeline is a necessary component of the Coon Pond Development and is required for generation. The average annual generation is 3720 MWh.

AI summary The pipeline is a necessary component of the Coon Pond Development and is required for generation, with an average annual generation of 3720 MWh.

N-4Responses to Third Set of Information Requests 8/30/2010 1 passage
NON-CONFIDENTIAL p. p. 0
NON-CONFIDENTIAL 1 Response IR-11: (cont'd) 2 3  February 20 – June 16: Generating 4  June 16: Blowout occurred in the upper section of the woodstave pipe and it was 5 dewatered. The pipe remained out of service to Dec. 31. 6  June 24-2...

AI summary The document outlines the timeline and actions taken by NSPI regarding the repair of a damaged woodstave pipe, including inspection, assessment, application filing, and project execution as part of the ACE 2010 plan.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →