Matter: Nova Scotia Power Inc. - CI C0067183 – TUC Wharf Access Bridge Replacement - $2,426,669 (U&U)
2 passages 2 documents

Renewable Energy across all matters →

N-1Application - CI C0067183 - TUC Wharf Access Bridge Replacement - Redacted 1 passage
Why do this project now? p. p. 5
Why do this project now? Visual Inspection and Non-Destructive Examination (NDE) using Ultrasonic Testing (UT) thickness measurements, which were conducted in 2024, showed deterioration in the condition of both the connections and the stee...

AI summary Ultrasonic testing in 2024 revealed deterioration in the wharf platform's structural elements, requiring replacement by 2025. The wharf's capacity has been reduced to six people at a time, and replacement is needed before the next heavy fuel oil delivery in early 2026 to avoid impacting fuel supply to thermal generation sites.

N-2NSPI (NSEB) RIR 1 to 8 - Redacted 1 passage
REDACTED CI C0067183 NSEB IR-6 Attachment 1 Page 2 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 8-9
REDACTED CI C0067183 NSEB IR-6 Attachment 1 Page 2 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) TUFTS COVE WHARF REPLACEMENT Recommendation RFP-03/2025-467 July 2025

AI summary This document contains a redacted recommendation related to the Tufts Cove Wharf Replacement, including a Request for Proposal (RFP) dated July 2025. Specific details are confidential and have been removed.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →