Date Filed: August 22, 2025 NSPI (NSEB) IR-5 Page 2 of 2 1 Request IR-6: 2 3 Reference to 2025 10-Year System Outlook (M12386), page 17 of 64 (Figure 7), NS Power 4 notes that Point Aconi will be retired on 2029/2030. 5 6 (a) How does the...
AI summary The document discusses the proposed boiler refractory system refurbishment at Point Aconi, aligning with NS Power's goal of achieving 80% renewable energy by 2030. The refurbishment aims to ensure safe and reliable operation until the facility's planned retirement in 2029/2030, supporting system reliability during the energy transition.