HomeRenewable EnergyM12373Evidence
Topic/Matter Intersection

Topic:"Renewable Energy" in M12373

Matter: Nova Scotia Power Inc. - CI C0067908 – POA Boiler Refractory Refurbishment 2025 – $1,378,466
2 passages 2 documents

Renewable Energy across all matters →

N-2NSPI (NSEB) RIR 1 to 6 1 passage
Date Filed: August 22, 2025 NSPI (NSEB) IR-5 Page 2 of 2 p. p. 46
Date Filed: August 22, 2025 NSPI (NSEB) IR-5 Page 2 of 2 1 Request IR-6: 2 3 Reference to 2025 10-Year System Outlook (M12386), page 17 of 64 (Figure 7), NS Power 4 notes that Point Aconi will be retired on 2029/2030. 5 6 (a) How does the...

AI summary The document discusses the proposed boiler refractory system refurbishment at Point Aconi, aligning with NS Power's goal of achieving 80% renewable energy by 2030. The refurbishment aims to ensure safe and reliable operation until the facility's planned retirement in 2029/2030, supporting system reliability during the energy transition.

98780NSEB (NSPI) IR 1 to 6 1 passage
Request IR-6:
Request IR-6: - Reference to 2025 10-Year System Outlook (M12386), page 17 of 64 (Figure 7), NS Power notes that Point Aconi will be retired on 2029/2030. - a) How does the proposed boiler refractory system refurbishment align with NS Powe...

AI summary Request IR-6 queries NS Power about maintenance strategies for Point Aconi, alignment with 80% renewable energy goals by 2030, and plans for adjusting maintenance post-retirement (2029/2030). Questions focus on refurbishment alignment, regular maintenance procedures, and potential strategy revisions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →