HomeRenewable EnergyM12843Evidence
Topic/Matter Intersection

Topic:"Renewable Energy" in M12843

Matter: Nova Scotia Power Inc. CI C0044172 – L7005 Canso Crossing Vibration Mitigation - $2,431,095 (P&A)2026 Q1 Capital Reports
2 passages 1 document

Renewable Energy across all matters →

N-2CI C0044172 REFILE - Redacted 2 passages
REDACTED CI C0044172 Attachment 1 Page 14 of 247 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. pp. 17-21
REDACTED CI C0044172 Attachment 1 Page 14 of 247 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Rev1. Sep. 2024 Page 14 of 27 APPENDIX 0 DR. HAVARD REPORT 2021 REDACTED CI C0044172 Attachment 1 Page 15 of 247 Canso Strait 230 kV Crossing Asse...

AI summary This document contains a redacted section of a regulatory proceeding, referencing an appendix from a 2021 report by Dr. Havard, and includes a redacted assessment of the Canso Strait 230 kV Crossing. The content is part of a larger submission and includes a figure related to the assessment.

60% Higher wind at Port Hastings than at EDDY point p. p. 45
60% Higher wind at Port Hastings than at EDDY point

AI summary The document highlights that wind speeds at Port Hastings are 60% higher than at the EDDY point, indicating significant differences in wind resource potential between the two locations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →