N-1CI C0083591 – IR746 Petpeswick Community Solar - $0 - Redacted
7 passages
REDACTED (CONFIDENTIAL INFORMATION REMOVED) CI C0083591 IR746 Petpeswick Community Solar REDACTED May 4, 2026 REDACTED (CONFIDENTIAL INFORMATION REMOVED) NSEB APPROVAL SHEET Project Title: IR746 Petpeswick Community Solar CI Number: C00835...
AI summary This document is an NSEB approval sheet for the IR746 Petpeswick Community Solar project, detailing expenditure profiles and approvals. It includes budget amounts, project estimates, and authorization types for the years 2026 and 2027. The document was submitted by Nova Scotia Power Incorporated and approved by the Nova Scotia Energy Board on May 4, 2026.
Why do this project? NS Power has a requirement to serve interconnection customers participating in the Government of Nova Scotia's Community Solar Program. The Minister has issued a Power Purchase Agreement for this project, in accordance...
AI summary NS Power must serve interconnection customers in the Community Solar Program under a Power Purchase Agreement issued by the Minister, per s.11(5) of the Electricity Act. The project adds 2.2 MW of solar energy to the grid, aligning with renewable energy goals.
REDACTED CI C0083591 Page 3 of 4 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Capital Project Detailed Estimate Location: CI# : Distribution C0083591 Title: IR746 Petpeswick Community Solar
AI summary The document provides a detailed estimate for a capital project related to the IR746 Petpeswick Community Solar initiative, located under the Distribution category. The page is part of a regulatory proceeding with confidential information redacted.
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Transmission Line Infrastructure Required fields: Estimate Classification Project Name: IR746 Petpeswick Community Solar Started or Preliminary Class 5...
AI summary The document presents a checklist and maturity matrix for the IR746 Petpeswick Community Solar project, focusing on the transmission line infrastructure. It outlines the project's scope, capacity, location, requirements, technology selection, strategy, planning, and regulatory approval. The matrix categorizes the maturity level of project definition deliverables across different estimate classifications.
INTERCONNECTION REQUEST #746 SYSTEM IMPACT STUDY Community Solar program: Total 2.2 MW Capacity Site Address: West Petpeswick Road, Musquodoboit Harbour, NS B0J 2L0 Report Number: M-DSIS-2025-009
AI summary This document outlines an interconnection request (#746) for a 2.2 MW Community Solar program located on West Petpeswick Road, Musquodoboit Harbour, NS. A Distribution System Impact Study (DSIS) has been assigned report number M-DSIS-2025-009.
REDACTED CI C0083591 Attachment 1 Page 7 of 39 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Figure 1: Proposed Solar Location The proposed development is for the installation of 2.2 MW of solar generation with inverters. The installation ha...
AI summary The document presents a figure titled 'Proposed Solar Location' depicting the installation of a 2.2 MW solar generation project with inverters, which has been approved under the Community Solar Program.
Table 6: Voltage Limit Default Settings – from Table 10, CSA C22.3 No. 9 Function Voltage (% of nominal voltage) Clearing Time (sec) OV3 >120 0.16 OV2 > 110 2 OV1 > 106 120 UV1 < 88 10 UV2 < 45 0.16 Voltage ride-through performance require...
AI summary The document provides voltage limit default settings and ride-through performance requirements for inverter-based generation, referencing CSA C22.3 No. 9 and IEEE 1547-2018. It outlines voltage thresholds and clearing times for overvoltage and undervoltage conditions, as well as operational requirements during these events.