Matter: Nova Scotia Power Inc. - CI 49036 – HYD - Avon 2 Controls Upgrade - $1,073,463
4 passages 3 documents

Renewable Energy across all matters →

N-1Application - CI 49036 - HYD Avon 2 Controls Upgrade - Redacted 2 passages
DESCRIPTION: p. p. 8
DESCRIPTION: This project is for the upgrade and modernization of the control system for the hydro turbine and generator at the Avon 2 Hydro Station. The project includes the installation of new instrumentation, replacement of Programmable...

AI summary This project involves upgrading the control system at the Avon 2 Hydro Station, including new instrumentation, PLCs, and data transfer to the NS Power Data Centre. The upgrades enhance remote and local control, online monitoring, and data logging capabilities. The initiative supports NS Power's risk-based investment strategy and improves asset condition assessments for the Avon hydro assets.

Document No: XXX-XX-XXXX-XXXX p. p. 8
Document No: XXX-XX-XXXX-XXXX Hydropower Required fields: Project Name: HYD - Avon 2 Controls Upgrade Started or Preliminary Maturity Level of Project Definition Deliverables Defined or Complete General Project Data A. Scope Project Scope...

AI summary The document outlines the project details for the HYD - Avon 2 Controls Upgrade hydropower project, including its scope, capacity, location, and various planning and regulatory requirements. It provides information on the maturity level of deliverables and highlights areas that are defined versus those that are preliminary or not applicable.

99992Board Decision Letter 1 passage
Project Description p. p. 0
Project Description The Avon 2 generating station is a single unit powerhouse that, on average, generates 9.4 GWh of hydroelectricity a year. The control system is out of date and at the end of its operational life. NS Power seeks approval...

AI summary NS Power seeks approval to upgrade the control system at the Avon 2 generating station to improve operational efficiency and real-time monitoring capabilities. The project involves installing new instrumentation, PLCs, and network infrastructure, with a revised budget of $1,073,463. It is part of the 2025 ACE Plan (M12012).

99992Board Decision Letter 1 passage
Project Description p. p. 0
Project Description The Avon 2 generating station is a single unit powerhouse that, on average, generates 9.4 GWh of hydroelectricity a year. The control system is out of date and at the end of its operational life. NS Power seeks approval...

AI summary NS Power seeks approval to upgrade the control system at the Avon 2 generating station to improve operational efficiency. The project includes installing new instrumentation, PLCs, and network infrastructure, and is part of the 2025 ACE Plan with a revised budget of $1,073,463.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →