Section 3 p. p. 0
DRO made decision on: December 8 2025 Type of complaint: Billing Issues Additional details: Good Afternoon I am writing to tell you about an injustice that is happening with the customers that paid to have solar systems installed with an o...

AI summary A customer is complaining about Nova Scotia Power (NSP) taking 3,568 kilowatt hours from their solar system on December 31st, which they argue is unfair. The customer suggests changing the reset date to March 31st, as solar systems generate more power in the summer, and the current setup unfairly penalizes customers during winter months.

R-3NSPI Response to the Appeal - Redacted 1 passage
CONFIDENTIAL (ATTACHMENTS ONLY) p. p. 0
only for the applicable non-KWh monthly charges and shall have the excess self-generation "banked" as energy credits to be applied against future bills over a period not exceeding 12 calendar months." Only the NSEB can revise approved Regu...

AI summary The document discusses the Self-Generation Option (SGO) introduced by amendments to the Electricity Act (Bill 145) in 2022, which allows customers to install up to 27 kW of generation or battery storage without formal enrollment in a NS Power program. The former Net Metering Program was retired. NS Power is required to purchase electricity up to the customer's annual usage at the same rate, with no obligation to compensate for excess generation. Excess self-generation is credited to future bills over 12 months.

101400Board Decision Letter (redacted) 2 passages
Section 2 p. p. 0
d only for the applicable non-KWh monthly charges and shall have the excess selfgeneration "banked" as energy credits to be applied against future bills over a period not exceeding 12 calendar months. NS Power provided a response to this a...

AI summary The appeal concerns how self-generation credits are applied to customer bills, with NS Power stating that the Electricity Act sets the rules and the Board has no authority to change them. The DRO referenced Regulation 3.6.4(b), but the legislation from 2022 and the new Electricity Act confirm that the rules for low-impact generators and storage devices remain unchanged.

Section 4 p. p. 0
- 7 (1) A Nova Scotia Power customer may, as of right, with no requirement to participate in a Nova Scotia Power program, install a renewable low impact generator or energy storage device with a total nameplate capacity of 27 kilowatts or...

AI summary This text outlines regulations for customers of Nova Scotia Power who install renewable low-impact generators or energy storage devices with a capacity of 27 kW or less. It details the rights of customers to generate their own electricity, the obligation of Nova Scotia Power to purchase excess electricity, and the conditions under which existing net-metering contracts may be terminated.

101345Board Letter to NSPI re Contract Verification (redacted) 1 passage
Section 1 p. p. 0
March 24, 2026 [email protected] Kathleen Murray Regulatory Counsel P O Box 910 1223 Lower Water St Halifax NS B3J 3S8 Dear Counsel: M12611 – DRO Appeal – David Rossiter The Board member assigned to this matter, Richard J. Melanso...

AI summary The Board is seeking confirmation from NS Power regarding whether a contract existed with David Rossiter as a net-metering customer prior to April 22, 2022, as it may affect the application of transitional provisions in the Electricity Act.

101400Board Decision Letter (redacted) 1 passage
Section 4 p. p. 0
- 7 (1) A Nova Scotia Power customer may, as of right, with no requirement to participate in a Nova Scotia Power program, install a renewable low impact generator or energy storage device with a total nameplate capacity of 27 kilowatts or...

AI summary This section outlines the rights of Nova Scotia Power customers to install renewable low-impact generators or energy storage devices up to 27 kilowatts, and the obligations of Nova Scotia Power to purchase excess electricity generated, subject to certain conditions and limitations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →