· Application · 05/13/2026
Nova Scotia Power requests a five-day extension to respond to Information Requests in the 2025 Net Metering Report proceeding, citing overlapping analysis with the parallel Commercial Net Metering Program matter.
AI summary
- NS Power filed its 2025 Net Metering Report (M12783) on March 31, 2026, and the NSEB issued Information Requests on April 30, 2026, with responses originally due May 21, 2026.
- The Company identified that NSEB IR-4 in M12783 requests analysis substantively similar to NSEB IR-6 in the Commercial Net Metering proceeding (M12782), prompting coordinated analysis across both matters.
- NS Power is conducting joint quality assurance on methodology, assumptions, and results to ensure consistency between the two proceedings.
- The Company requests a deadline extension to May 26, 2026, aligning IR response dates in M12783 with those already set in M12782.
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- 101983 Letter NSPI re: Extension request for IRs