AI-generated summary
· Rir · 08/07/2026
Nova Scotia Power filed responses to eleven information requests in the Greg Hammond DRO Appeal concerning meter changes, AMI billing errors, and smart meter accuracy
AI summary
- NS Power confirmed meter #1132914 was replaced with AMI meter #2300017 on January 4, 2022, as part of the Advanced Metering Infrastructure rollout; neither meter was tested at the time of change, as this is not standard practice (IR-1, Exhibit H3 p. 74)
- A January 2026 billing error resulted in $0.00 charges after a meter change service order was closed on the same billing date, causing the CIS system to register a zero current read and suppress estimated consumption; NS Power did not identify the issue until April 2026 (IR-6, IR-7)
- NS Power confirmed the Cybersecurity event disrupted AMI data transmission; the last meter read before the event was April 24, 2025, showing 2,099.314 kWh delivered, with historical interval data provided in Attachment 1 (IR-9)
- NS Power denied any known hardware, software, or installation issues with the complainant's smart meter that could cause inflated readings, and described a multi-stage abnormality detection process from meter collection through to the billing system (IR-10)
- The complainant's original TOU designation was administratively renamed Time of Day (TOD) in 2023 to avoid confusion with a new Time Varying Pricing pilot program; NS Power confirmed no change to metering equipment or billing methodology occurred (IR-4)
Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
What was filed
Documents filed on this day
- H-5 NSPI (NSEB) RIR-1 to RIR-11