Nova Scotia Power filed responses to seven NSEB information requests in the Lingan Unit 2 2025/26 Capacity Requirement proceeding, confirming the 148 MW coal unit is needed through at least winter 2029/30 to maintain planning reserve margin.

M12959 · Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251
AI summary
  • Nova Scotia Power Inc confirmed Lingan Unit 2 (LIN2) has a rated capacity of 148 MW and was recalled to service multiple times between Q2 2025 and August 2026, generating a cumulative total of approximately 239,495 MWh across eight dispatch intervals (IR-1(c) table).
  • The 2026/2027 winter planning reserve margin stands at 22% of firm peak with LIN2 available, just above the NPCC reliability criterion of 20%; NSPI stated that without LIN2's capacity contribution, the system would not meet the required System Reliability threshold (IR-2).
  • Firm import constraints limit near-term alternatives: Newfoundland provides ~145.4 MW firm via the Maritime Link Base Block, but no additional dispatchable resources exist there; New Brunswick's 100 MW firm capacity is not expected until as early as 2028, contingent on the NS-NB reliability intertie and NB Power RIGS project being commissioned (IR-3).
  • The $4,392,251 approval request covers capital expenditures only; a separate $1,331,000 in 2025 OM&G costs — expensed as non-regulated — is also submitted for reclassification to regulated operating expenditures consistent with the Board's prior decision in M11706 (IR-5).
  • NSPI disclosed cumulative capital investments of approximately $5.48M across three prior LIN2 capacity requirement CIs (2022/23 through 2024/25) and confirmed that future 2026/27 and 2027/28 project amounts remain TBD, dependent on as-found inspection results during annual maintenance outages; the 2026/27 amount is expected to be similar to the current $4.39M project (IR-6, IR-7).

Disclaimer: This summary was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

What was filed

Documents filed on this day

  • N-2 NSPI (NSEB) RIRs 1-7 - Redacted exhibits
  • N-2(C) NSPI (NSEB) RIRs 1-7 - Confidential exhibits
  • 103342 Letter enclosing RIRs / confidentiality request other_documents