Letter from NSPI with proposed timeline, as requested.
05512.pdf · PDF · 581.9 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit containing a letter from Nova Scotia Power Inc. (NSPI) outlining a proposed timeline for the approval of NERC and NPCC standards, including details on the audit process, recommended procedural steps, and key dates for interventions and decision-making.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M03324 — E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria