05300 Key documents

Board Decision Letter 9/20/2010

Download original
05300.pdf · PDF · 61.6 KB · 1 page
AI overviewWhat this document contains

This document is an exhibit from a Nova Scotia Energy Board regulatory matter. It contains a Board Decision Letter dated September 20, 2010, confirming approval for an increased final cost of CI#35882 (2009 Cutout Replacements) requested by Nova Scotia Power Inc., due to higher labor, overheads, construction interest costs, and reduced contracted costs.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M03515 — CI# 35882 - P-510 - NSPI WO - 2009 Cutout Replacements - $1,642,511

Filing event: ORDER on unknown · View digest →

1 page
100%