RIRs Attachment SEB-NSPI - 4a (Large File - 40 MB)
N-40.pdf · PDF · 42.9 MB · 82 pages
AI overviewWhat this document contains
This document is a large exhibit (Attachment SEB-NSPI-4a) consisting of multiple financial tables and reporting templates submitted as part of an RIR batch. It contains detailed breakdowns of operational and maintenance expenses, power production costs, and transmission and distribution expenses for various utility respondents, including Alabama Power Company, Duke Energy Corporation, and others. The tables itemize specific costs for steam, nuclear, and hydraulic power generation—such as fuel, engineering, and structural maintenance—alongside data regarding the disposition of electric energy generated, purchased, and wheeled.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M06319 — P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
Filing event: RIR on 01/12/2007