70542 Other documents 07/17/2017

Comments - IG

Download original
70542.pdf · PDF · 291.7 KB · 2 pages
AI overviewWhat this document contains

This document is an intervenor filing containing comments submitted by the Industrial Group on Synapse's Terms of Reference for M08059. It covers recommendations for sensitivity analyses related to energy efficiency, capital scenarios, load scenarios with and without Below-the-Line loads, and considerations around demand response, interruptible load, stakeholder input, and modeling assumptions.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M08059 — Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization

2 pages
100%