Addendum to Final Report - Generation Utilization and Optimization - DSM Avoided Costs 10-24-2018
75687.pdf · PDF · 707.4 KB · 3 pages
AI overviewWhat this document contains
This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains an addendum to a final report analyzing avoided energy and capacity costs resulting from Demand Side Management (DSM) resources under a medium DSM scenario compared to a reference scenario, covering the period 2018–2042. The analysis includes calculations of avoided costs using a differential revenue requirements approach, considerations of emissions constraints, and comparisons of energy consumption, peak load, and financial metrics between scenarios.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M08059 — Nova Scotia Power Inc. (NSPI) - Generation Utilization and Optimization