Confidential Undertaking
78564.pdf · PDF · 21.6 KB · 4 pages
AI overviewWhat this document contains
This document is an exhibit containing confidentiality terms for a regulatory proceeding before the Nova Scotia Utility and Review Board. It outlines conditions for the disclosure and handling of designated confidential information related to the 2020 Integrated Resource Plan matter (M08929), including restrictions on sharing, requirements for undertakings, and procedures for returning the information after the Board's decision.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization
Filing event: APPLICATION on 08/19/2019 · View digest →