77668 Other documents 05/17/2019

Letter from NSPI re pre-IRP workshops

Download original
77668.pdf · PDF · 187.6 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a letter from NS Power informing the Board of progress on pre-IRP deliverables, including the scheduling of stakeholder workshops and the timeline for completing key studies related to the 2020 Integrated Resource Plan.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization

Filing event: APPLICATION on 05/17/2019 · View digest →

2 pages
100%