N-3 Exhibits 06/12/2024

NSPI (EOne) RIR-1 to RIR-6

Download original
N-3.pdf · PDF · 358.6 KB · 10 pages
AI overviewWhat this document contains

This document is an exhibit (Exhibit N-3) from a RIR batch filed with the Nova Scotia Energy Board, containing responses from NSPI (EOne) to information requests regarding the 2024 Load Forecast Report. It covers topics including heat pump performance assumptions, hybrid peak scenarios, electric vehicle (EV) charging managed load forecasts, and the alignment of NS Power's load forecasting with provincial clean energy and emissions targets.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11689 — Nova Scotia Power Inc. (NSPI) - 2024 Load Forecast Report

Filing event: RIR on 06/12/2024 · View digest →

10 pages
100%