N-5 Exhibits 06/19/2024

NSPI (SBA) RIR-1 to RIR-10

Download original
N-5.pdf · PDF · 184.4 KB · 11 pages
AI overviewWhat this document contains

This document is an exhibit containing responses from NSPI to SBA information requests (RIR-1 to RIR-10) related to the 2024 Load Forecast Report. It covers topics including the impact of DER and energy efficiency scenarios, the absence of probabilistic analysis, the role of weather in peak demand changes, load forecast methodology, and clarification on the use of specific models and data sources.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11689 — Nova Scotia Power Inc. (NSPI) - 2024 Load Forecast Report

Filing event: RIR on 06/19/2024 · View digest →

11 pages
100%