94287 Other documents 05/29/2024

EOne (NSPI) IR-1 to IR-6

Download original
94287.pdf · PDF · 223.4 KB · 6 pages
AI overviewWhat this document contains

This document is an information request (IR) filed as part of a regulatory matter before the Nova Scotia Energy Board. It contains a series of questions and requests submitted by EfficiencyOne to Nova Scotia Power Inc. regarding assumptions, methodologies, and data in NS Power's 2024 Load Forecast Report, including topics such as hybrid heat pump scenarios, EV adoption, load forecasting methods, and emissions impacts.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11689 — Nova Scotia Power Inc. (NSPI) - 2024 Load Forecast Report

Filing event: APPLICATION on 05/29/2024 · View digest →

6 pages
100%