95870 Other documents 11/12/2024

BCC Migard (NSPI) IR-1 to 6 - Redacted (Refiled Nov. 29)

Download original
95870.pdf · PDF · 848.8 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a series of information requests (IR-1 to IR-6) related to Nova Scotia Power Incorporated's application for approval of a Capital Work Order for the HYD Ruth Falls Main Dam Refurbishment project, covering topics such as engineering drawings, cost breakdowns, contingency fund allocation, project cost estimate classification, and communications with the Department of Fisheries and Oceans.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11927 — Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)

Filing event: APPLICATION on 11/12/2024

4 pages
100%