98213 Other documents 06/24/2025

SBA (NSPI) IR 1 to 18

Download original
98213.pdf · PDF · 175.0 KB · 5 pages
AI overviewWhat this document contains

This document is an exhibit containing a series of information requests (IRs) filed in a Nova Scotia Energy Board regulatory matter, addressing various aspects of the 2025 Evergreen Integrated Resource Plan (IRP) Action Plan and Roadmap update by Nova Scotia Power Inc. (NSPI). Topics covered include compliance with renewable energy standards, emissions regulations, offshore wind objectives, cost analysis, transmission infrastructure monitoring, hydrogen tariff development, and alignment with provincial climate goals.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12247 — Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update

5 pages
100%