98218 Other documents 06/24/2025

ESC (NSPI) IR 1 to 5

Download original
98218.pdf · PDF · 189.1 KB · 2 pages
AI overviewWhat this document contains

This document is an intervenor submission in a Nova Scotia Energy Board regulatory matter, containing a request by Energy Storage Canada (ESC) for information from Nova Scotia Power regarding the Evergreen IRP Action Plan, including details on the Effective Load Carrying Capacity (ELCC) study, Renewable Electricity Standard (RES) contributions, thermal asset generation profiles, IRP model optimization for renewable curtailment, and historical renewable curtailment data for 2022–2024 and projections for 2030–2035.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12247 — Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update

2 pages
100%