99006 Other documents 08/19/2025

Submission - SBA

Download original
99006.pdf · PDF · 2.1 MB · 4 pages
AI overviewWhat this document contains

This document is an intervenor submission in a Nova Scotia Energy Board regulatory matter, containing comments from the Small Business Advocate (SBA) on Nova Scotia Power's 2025 Evergreen Integrated Resource Plan (IRP) Action Plan Update. Topics covered include concerns about the transition of IRP responsibilities, the need for effective long-term resource planning, issues with capacity planning, delays in updating CT price assumptions, the ELCC study, and the exclusion of offshore wind from the selected IRP.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12247 — Nova Scotia Power Inc. - Evergreen IRP Action Plan & Roadmap Update

4 pages
100%