97695 Other documents 05/16/2025

2025 Q1 Capital Report

Download original
97695.pdf · PDF · 991.1 KB · 7 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter and contains a 1st Quarter Overview of capital expenditures as of March 31, 2025. It covers approved, deferred, and withdrawn projects under various Annual Capital Expenditure (ACE) Plans, including details on project names, costs, statuses, approval dates, and references to specific ACE plans and orders. The document also outlines changes to ACE items, such as the removal of a specific project, and provides information on projects awaiting approval or submission under the 2025 ACE Plan.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12279 — Nova Scotia Power Inc. - CI C0051136 – TUC2 HP/IP Turbine Refurbishment – $5,965,028 (ATO)

7 pages
100%