98425 Other documents 07/07/2025

Letter NSPI re: Capital Items Filed Outside the Quarter Package

Download original
98425.pdf · PDF · 226.5 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a letter requesting approval for capital items submitted outside the standard quarter package, details of specific capital items from the 2025 ACE Plan, information on the Ragged Lake Generator Replacement project, and a request for confidential treatment of certain Capital Work Orders.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12373 — Nova Scotia Power Inc. - CI C0067908 – POA Boiler Refractory Refurbishment 2025 – $1,378,466

Filing event: APPLICATION on 07/07/2025 · View digest →