Application
N-1.pdf · PDF · 1.4 MB · 13 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of a regulatory application batch with the Nova Scotia Energy Board. It contains information related to a boiler refractory replacement project at the Point Aconi facility, including project details, budget estimates, cost breakdowns, contingency planning, and specifications for refractory materials and installation methods.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12373 — Nova Scotia Power Inc. - CI C0067908 – POA Boiler Refractory Refurbishment 2025 – $1,378,466
Filing event: APPLICATION on 07/07/2025 · View digest →