99128 Other documents 08/27/2025

NSEB (NSPI) IR 1 to 9

Download original
99128.pdf · PDF · 180.5 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing a series of information requests (IRs) directed to Nova Scotia Power Incorporated regarding the FLISR Implementation application. The topics covered include requests for detailed information on outage management, reliability improvements, FLISR technology selection, project performance metrics, cost breakdowns, contingency planning, and funding status.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12417 — Nova Scotia Power Inc. - CI C0071528 – FLISR Implementation – $4,638,245

4 pages
100%