N-59-(ii) Exhibits 01/12/2026

Response to Undertaking 12 - 2026-2027 GRA U-12 Att 01​ - Revised with forumlas ​ELG vs ALG Rate Base Comparison

Download original
N-59-(ii).xlsx · XLSX · 5.1 MB

The AI overview for this document is being prepared.

Filed in: M12451 — Nova Scotia Power Inc. - 2026 General Rate Application (GRA)

Preview isn’t available for this file type — use Download original above to view it.