N-59-(ii)
Exhibits
01/12/2026
Response to Undertaking 12 - 2026-2027 GRA U-12 Att 01 - Revised with forumlas ELG vs ALG Rate Base Comparison
N-59-(ii).xlsx · XLSX · 5.1 MB
The AI overview for this document is being prepared.
Filed in: M12451 — Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
Preview isn’t available for this file type — use Download original above to view it.