NSPI (NSEB) RIR 1 to 9 - Redacted
N-2.pdf · PDF · 18.4 MB · 133 pages
AI overviewWhat this document contains
This document is an exhibit from a Nova Scotia Energy Board regulatory matter, containing multiple redacted checklists, maintenance procedures, and technical condition assessments related to the Upper Lake Falls Unit 2 hydroelectric facility. Topics covered include turbine and generator component inspections, maintenance tasks, oil testing procedures, mechanical and electrical inspection checklists, and condition assessments of various system parts such as wicket gates, bearings, seals, and draft tubes.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12455 — Nova Scotia Power Inc. - CI C0059783 – HYD Upper Lake Falls 2 Overhaul – $1,582,014
Filing event: RIR on 10/08/2025