N-2 Exhibits 12/08/2025

Compliance Filing - NS Power

Download original
N-2.pdf · PDF · 8.2 MB · 66 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of a regulatory matter by Nova Scotia Power with the Nova Scotia Energy Board. It contains compliance filings related to amendments to Time-Varying Pricing (TVP), Time-of-Use (TOU), and Critical Peak Pricing (CPP) tariffs, including revised rates, implementation details, notification requirements, and the introduction of an interim energy charge.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12499 — Nova Scotia Power Inc. - Application for approval of  2025/26 Time Varying Pricing (TVP) Tariffs

Filing event: APPLICATION on 12/08/2025

66 pages
100%