100335 Other documents 12/17/2025

Letter NSPI re: Extension request

Download original
100335.pdf · PDF · 1.2 MB · 11 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a letter from NS Power requesting an extension to submit the Year 4 Evaluation, Measurement and Verification (EM&V) Report, citing delays caused by a cyber incident, and providing an update on progress, including plans to file the report in Q2 2026. The document also outlines various deliverables and commitments related to Time-Varying Pricing (TVP), tariff design, rate design, and other regulatory proceedings.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12499 — Nova Scotia Power Inc. - Application for approval of  2025/26 Time Varying Pricing (TVP) Tariffs

Filing event: APPLICATION on 12/17/2025

11 pages
100%