N-3(C) -(ii) Exhibits 11/26/2025

NSPI (IG) RIR-10 At​t 02 - Excel - Confidential

Download original
N-3(C) -(ii).pdf · PDF · 117.8 KB · 1 page

No AI summary available — too little text in this document to summarize.

Filed in: M12521 — Nova Scotia Power Inc. - Application for 2026 DSM Cost Recovery Rider (DCRR)

Filing event: RIR on 11/26/2025

1 page
100%