Comments - NSIESO
100623.pdf · PDF · 124.2 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains comments from the IESO Nova Scotia regarding Concentric's FERC Order 2023 report, specifically addressing transmission interconnection processes and confirming the IESO's jurisdiction over the matter.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12524 — Nova Scotia Power Inc. - Concentric FERC Order 2023 Report
Filing event: APPLICATION on 01/19/2026