Comments - CA
101696.pdf · PDF · 165.6 KB · 4 pages
AI overviewWhat this document contains
This document is an intervenor submission containing comments on Concentric's recommendation to adopt FERC Order 2023's penalty structure for interconnection study delays, discussions on cost allocation for network upgrades, and proposals related to SGIP revisions in 2026. Topics covered include concerns about applying penalties to IESO Nova Scotia, proportional impact approaches for cost allocation, challenges in projecting benefits from small-scale renewable projects, and an interim agreement between IESO NS and NS Power expected in Q1 2026.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12524 — Nova Scotia Power Inc. - Concentric FERC Order 2023 Report
Filing event: APPLICATION on 04/22/2026