AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in matter M10905. It contains a letter from Nova Scotia Power regarding the submission of Concentric Energy Advisors' report on FERC Order 2023, updates on the review of the Standards Generator Interconnection Procedures (SGIP), and the upcoming transfer of responsibility for transmission system interconnection processes to the IESO-NS.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12524 — Nova Scotia Power Inc. - Concentric FERC Order 2023 Report

Filing event: APPLICATION on 10/23/2025