100153 Other documents 12/01/2025

Renewall (NSPI) IR 1 to 20 - WORD

Download original
100153.docx · DOCX · 91.5 KB
AI overviewWhat this document contains

This document is an information request (IR) filed by Renewall Energy Inc. in a Nova Scotia Energy Board (NSEB) regulatory matter concerning Nova Scotia Power’s 2026 Annually Adjusted Rates (AAR). It covers topics including generator class marginal unit hours, PLEXOS model assumptions and accuracy, forecasting practices, marginal and average cost calculations, environmental costs, surplus energy delivery, sensitivity analyses, tariff components, and the impact of various scenarios on cost calculations and risk management.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12551 — Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs)

Preview isn’t available for this file type — use Download original above to view it.