IG (NSPI) IR 1 to 5 - WORD
100155.docx · DOCX · 40.5 KB
AI overviewWhat this document contains
This document is an information request (IR) filed in a Nova Scotia Energy Board regulatory matter. It covers topics including Nova Scotia Power's 2026 Annually Adjusted Rates (AAR) application, load forecasts, the impact of the Goose Harbour Wind Farm and PHP becoming an ATL customer, the effect of a cyber incident on data access, avoided fuel cost adjustments, and recommendations related to the ELIADC Tariff and FCR definition.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12551 — Nova Scotia Power Inc. - 2026 Annually Adjusted Rates (AARs)
Preview isn’t available for this file type — use Download original above to view it.