N-2 Exhibits 01/14/2026

NSPI (NSEB) RIR 1 to 3 - Redacted

Download original
N-2.pdf · PDF · 21.6 MB · 129 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing information related to the replacement of stoplogs at the Lower Great Brook Generating Station, energy production data for units LGB7 and LGB8, a final report on the Lower Great Brook Sluiceway Assessment, and various proposals, quotes, and cost breakdowns for engineering, archaeological, and security services associated with the project.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12590 — Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884

129 pages
100%