100323 Other documents 12/16/2025

NSEB (NSPI) IR 1 to 3 - WORD

Download original
100323.docx · DOCX · 30.0 KB
AI overviewWhat this document contains

This document is an IR response filed in a Nova Scotia Energy Board regulatory matter. It contains information related to Nova Scotia Power Inc.'s application to replace 120 stoplogs and refurbish four concrete piers at the Lower Great Brook Generating Station, including details on the project's scope, timeline, costs, inspection reports, and procurement processes.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12590 — Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884

Preview isn’t available for this file type — use Download original above to view it.